Product Roadmap
The direction is one automated pipeline: estimate data becomes an SOV, the SOV becomes a cost-loaded schedule, the field updates it in a single pass, executives get the narrative automatically — and delay analysis runs on the same record it was all built from. In the office, on the field, and early enough to matter.
The Pipeline
Pathizer does not do drawings. Bring takeoff and estimate data from the tools you already trust — Pathizer starts where they stop.
Automates: Nothing to replace: your takeoff stack stays.
An agent that structures the estimate and takeoff exports you provide into clean, reviewable scope — source-referenced, never hallucinated quantities.
Automates: The re-keying between estimating output and controls input.
Estimate data becomes a normalized SOV with package structure and review status — the commercial backbone the rest of the pipeline inherits.
Automates: SOV assembly and normalization from estimate structure.
From the SOV, the agent drafts WBS, activities, and schedule logic for your scheduler to review and own — a baseline foundation, not a black box.
Automates: The blank-page phase of baseline development.
Because the schedule descends from the SOV, cost loading and resource linkage come native — no after-the-fact mapping project.
Automates: SOV-to-schedule linking and cost-loaded baseline upkeep.
One interaction updates the schedule and the data entry together — live today, instead of passing a PDF around the field and having a scheduler re-key it with human error. Extending the same pass to the pay app is in development.
Automates: The update-cycle round trip: field capture and schedule entry today; pay-app alignment next.
Evidence-backed schedule narratives draft themselves today. Delinquency and drift notifications to executives — before the meeting, not during it — are next.
Automates: The reporting cycle: from analysis to executive-ready language.
Delay Analyzer with Half-Step Changes, driver attribution, and a source-linked evidence ledger — run in the same pass, so potential dispute issues surface early and accurately, while records are still fresh.
Automates: The weeks of manual reconstruction a delay review usually starts with.
This roadmap is directional and subject to change. It describes intended product direction, not a commitment to deliver any feature by any date, and it should not be relied upon in making purchasing decisions. Live capabilities are described on the product pages.
Why This Order
Pathizer started at the end of the pipeline — delay analysis — because that is where evidence standards are highest and where a wrong number costs the most. The deterministic engine, the evidence ledger, and the human-in-the-loop review discipline were built to that standard first.
Everything moving up the pipeline inherits it: the same source-linking, the same review-before-baseline discipline, the same refusal to hallucinate quantities. Automation earns its way forward, stage by stage.
Delay analysis, update review, narratives, and the evidence ledger run today on your own P6/XER updates.